防火网
本站  
设为首页 加入收藏 网站地图   中文版 繁体 English
 
测试服务: 机车材料防火测试 | 建筑产品防火测试 | 船舶防火测试 | 飞机防火测试 | 耐火测试 | 喷射火测试 | 其他测试
   
用户名:
密码:
验证码:
   
 
主要阻燃防火认证标准
火车船舶汽车建材
 
相关测试方法 更多>>
EN ISO 9239-1:2010地
EN ISO 1182:2010
NF P 92-501
NF P 92-507
法标F级测试
法标I级测试
法国M级测试
EN ISO 1182
EN ISO 9239-1
EN 13501-1
 
首页   美国   NFPA 37固定式内燃机和燃气涡轮安装和使用标准
 

NFPA 37固定式内燃机和燃气涡轮安装和使用标准

NFPA 37: STANDARD FOR THE INSTALLATION AND USE OF STATIONARY COMBUSTION ENGINES AND GAS TURBINES
NFPA 37: 固定式内燃机和燃气涡轮安装和使用标准
 
1.1 Scope. This standard establishes criteria for minimizing the hazards of fire during the installation and operation of stationary combustion engines and gas turbines.
 
Keep pace with the latest rules for safe engine operation and minimize fire hazards with the 2010 NFPA 37.
NFPA 37: Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines governs the installation and use of stationary engines and gas turbines fueled by liquid or gaseous fuels as prime movers for emergency generators, fire pumps, and stand-by and peak power systems. Requirements address system installation, fuel supplies, lubricating systems, engine exhaust systems, control and instrumentation, instructions, and fire protection features.
Make sure you're in the know about these important changes in the 2010 Standard:
·   Addition of guidance statements concerning retroactivity and equivalency
·   Enhanced definitions of ''automatic safety shutoff valve'' and ''automatic safety vent valve''
·   Clarification of alternatives to the minimum separation required between an engine and an adjacent structure
·   Amendments to the required safety components that must be provided in a fuel gas train for internal combustion engines
·   New requirements for the safety components that must be provided for the fuel gas train for gas turbines that are distinct from those for internal combustion engines
·   Acceptance of secondary containment-type fuel supply tanks for roof top installation
·   Provision requiring a double block valve arrangement in liquid fuel lines as a fire and explosion mitigation measure
·   Complete revision of Chapter 9: Control and Instrumentation, to establish minimum required protective controls for engines and turbines; to identify, for constantly attended installations, those devices that can safely be replaced by alarms and procedures; to incorporate necessary explanatory information in the Annex
·   Complete revision of Chapter 11: Fire Protection Features, and incorporation of necessary explanatory information in the Annex
·   Clarification of the procedure for calculating the fuel input rating
(Softbound, 25 pp., 2010)

更多防火阻燃测试认证,请咨询中国防火网
电话:400-666-7290
网址:www.firete.com
邮箱:info@firete.com

...


 来源:防火网 发布时间:12/13/2013 点击次数:1603

 上一条: NFPA 36溶剂萃取厂标准

 下一条: NFPA 40赛璐珞电影胶片的储存和处置标准
 
 
网站首页 | 测试服务 | 各国标准 | 新闻资讯 | 防火材料 | 会展信息 | 认证服务 | 在线咨询 | 联系我们
Copyright © 2009-2024 Firete.com All Right Reserved 苏公网安备 32010502010088号
服务热线:025-86583475   备案号:苏ICP备10201999号-1 DIN5510-2 DIN5510 防火网博客